Soooo....o!
After few weeks almost all the edges found have been smoothed and the code seems in a better shape.
The error log has just a couple of entries (one is related to openid, the other is yet again the missing txt index in mentions that I now I think I pinpointed and have fixed in a local branch, I'll push the code before tomorrow).
So, I was thinking... end of the month? O:-)
Do you have a (very) rough timeline of when you'd like to be at RC or stable for 1.1?
I hope the 1.1 beta will be much shorter than the 1.0 (even though we had some extensive changes).
I would hope to release 1 beta a month for 4/5 months than call the RC phase, that based on the previous release should last a couple of versions, so another two months.
Of course that's my most optimistic view. I hope to have it out in any case before the end of the year.
Fair enough. You do realise that now everyone will be freaking out if they don't get it for Christmas. :D
/me is already 9 months late so doesn't care. :P
ZOMG I WANTS IT NOW!! /troll
/me goes back to coding his addon.... for Elk 1.1